Skip to Main navigationSkip to Content  
 
Transpower LogoGrid New Zealand Title Image
Banner Image

Upper South Island Grid Upgrade

Publications & Resources

MCP Investment Test Consultation - May 2012

file type icon USI MCP [833kB]

Consultation document

file type icon USI Reliability - Attachment A [321kB]

Options and Costing Report

file type icon USI Reliability - Attachment B [989kB]

Technical Analysis Report

file type icon USI Reliability - Attachment C [616kB]

Investment Test Analysis

file type icon USI Reliability - Attachment D [200kB]

Summary of Submissions

file type icon USI Reliability - Attachment E [1.6MB]

ISL Substation HILP Event Study
Appendices to Attachment E

file type icon ISL HILP Study [3.7MB]

Marsh 16 Jun 2011

file type icon ISL Fire Protection [191kB]

Marsh 4 Aug 2011

file type icon ISL Initial Seismic Assessment [15.0MB]

Opus 2011

file type icon ISL Detailed Seismic Assessment [713kB]

Opus 2011

file type icon ISL SVIP Seismic Hazard Assessment [2.9MB]

Maunsell May 2004

file type icon ISL Disaster Recovery Plan [5.5MB]

TLM June 2009

file type icon ISLControl Room Fire Recovery Plan [3.7MB]

TLM - Aug 2011

file type icon ISL LVAC [1.4MB]

Options Report

RFI Process - June/July 2011

file type icon Submissions Summary [407kB]

Investigation into Upper South Island Grid Upgrade summary of submissions

file type icon Energy Response [255kB]

RFI Submission

file type icon Metec RFI [1.1MB]

RFI Submission

file type icon Mighty River Power RFI [455kB]

RFI Submission

file type icon Orion RFI [282kB]

RFI Submission

file type icon TrustPower RFI [381kB]

RFI Submission

file type icon Request for Information and Options, Approach and Assumptions document [1.3MB]

Request for Information and Options, Approach and Assumptions document

file type icon Aqualinc irrigation peak report [6.2MB]

Aqualinc Irrigation Peak Report

file type icon Need analysis [3.8MB]

Need Analysis