Grid Configuration

10 May 2012

Under the Electricity Industry Participation Code, Transpower is required to demonstrate a net benefit for any permanent reconfiguration of the grid.

Information about specific projects is available below.

ProjectGrid reconfiguration detailsNet benefit test
Mangamaire Bus Split Opening Transpower proposes to open the bus split at Mangamaire between the dates of 11 May and 30 June 2012. 

file type icon [358kB]

Arapuni Grid Reconfiguration

Transpower has implemented a system split at Arapuni between 6am and 9pm on weekdays. The system split is a permanent change in the way the grid is configured.

  • This is effective from 29 September 2011.

file type icon [324kB]

Studholme-Timaru Split Closure

Transpower is closing the operational split between Studholme and Timaru annually between October and April. This is to reduce loss of supply to NZ Dairies Limited plant at Studholme during an outage of the main circuit supplying from the south.

  • This is effective from 28th January 2010.

file type icon [95kB]