Stratford–Wanganui Line Conductor Replacement

Overview

What we're doing

Transpower is carrying out a project to replace the conductor (ie wire) on its 110 kV transmission line between Wanganui and Stratford.  The new conductor will be larger in capacity than the existing one to help connect potential new generation in the region.

Why we're doing it

The need for this project is based on a condition assessment of the line, which found that the conductor was at the end of its useful life.

Project Timeline

01.11.2009
Electricity Commission Approval
16.10.2009
Design Solution
14.12.2009
Award Tenders
15.12.2009
Construction
01.06.2012
Commissioning

Tendering

Tendering for this project (if any) will be made through either the GETS or Transpower website. Register at both these sites to be notified of any open tender release.

  • Project Reference:
    SFD_WNG-TRAN-EHMT-01
  • Region:
    Taranaki
  • Status:
    Committed
  • Cost Bracket:
    D "$20 - $50 million"
  • Timing:
    2011