Otahuhu Substation Diversity

Overview

What we're doing

Transpower is carrying out a project to reinforce its Otahuhu substation which is a critical connection point for transmission to Auckland and further north.

Why we're doing it

Most power into Auckland and Northland goes through Otahuhu substation, so Transpower is building another switchyard electrically and geographically separate from the existing one, but still within the existing substation site.  The new switchyard (to be housed within a building) will help connect both new and existing lines to and from Otahuhu.

This is a long-term solution that together with the following projects helps provide diversity of transmission into and across Auckland:

Project Timeline

01.01.2007
Electricity Commission Approval
01.01.2008
Design Solution
01.01.2009
Award Tenders
01.01.2010
Construction
01.12.2010
Commissioning

Tendering

Tendering for this project (if any) will be made through either the GETS or Transpower website. Register at both these sites to be notified of any open tender release.

  • Project Reference:
    OTA-SUBEST-DEV-01
  • Region:
    Auckland
  • Status:
    Committed
  • Cost Bracket:
    E "$50 - $100 million"
  • Timing:
    2010